A nine-man crew of Air Force and Army civilians added a structure to the east side of Hill Air Force Base in September, taking only two days to build it.
The structure, a Modular Extendable Rigid Wall Shelter or MERWS, was built ear the radome from a kit as a training exercise. The kit, including walls, floors, roof and support beams, all fits in an 8 by 8 by 20-foot storage container that weighs 14,700 pounds and can be moved by forklift.